TE Mechanism. This mechanism is fitted with a wheel to enable a precise control of the concrete flow. This mechanism also offers a lever control of the gate. Warning: a non-continuous flow of concrete between the bucket and the pipe might provoke untimely overflowing.
Presentation
Upright concrete skip with fork pockets and bale arm.
Means of handling
Either by crane with its bale arm
Or by forklift with its fork pockets
Safety
This skip is fitted with 2 fork pockets with a safety system to lock forks inside the pockets.
Discharge type
Central.
Gate operation
Wheel.
Skips with capacities of 1000L and above are fitted with the auxiliary gate closing option to ease the gate closure.
Characteristics
Skip belt in U profile for a higher robustness
Supplied with a 3 meter long hose, 200mm diameter (in option Ø 90, 150 or 250 mm)