Upright concrete skip with TE mechanism

With bale arm.

TE

2 915,00 €

Labels & garanties du matériel

Presentation video

Type of mechanism

TE Mechanism. This mechanism is fitted with a wheel to enable a precise control of the concrete flow.. This mechanism also offers a lever control of the gate. Warning: a non-continuous flow of concrete between the bucket and the pipe might provoke untimely overflowing

Presentation

This column skip is designed to enable concrete to be poured into narrow shuttering or columns.

Means of handling

This skip is lifted by its bale arm.

Discharge type

Central.

Gate operation

Wheel.

Skips with capacities of 1000 L and above are fitted with the auxiliary gate closing option to ease the gate closure.

Characteristics

  • Skip belt in U profile for a greater strength
  • Delivered with a 3 meter long hose, Ø 200mm (as option Ø 90, 150 or 250 mm available)
  • Type of skip: Discharge hose
  • Shape of bucket: Upright
  • Means of handling: Bale arm
  • Type of mechanism: TE kit
  • Discharge type: Central
  • Type of gate opening: By wheel
  • Forklift lifting: No