Upright concrete skip with TU mechanism
With bale arm.
TU mechanism. This gate opening mechanism enables a continuous flow of the concrete from the bucket to the formwork. A tilting receptacle prevents cement grout leakage. The gate is made of abrasive high resistance steel to improve its lifetime .
This column skip is designed to enable concrete to be poured into narrow shuttering or columns.
This skip is lifted by its bale arm.
Central.
By means of a nylon rope attached to a spring return lever.
Skips with capacities of 1000 L and above are fitted with the auxiliary gate closing option to ease the gate closure.