Laydown concrete skip with TU mechanism
With lifting points and offset discharge gate.
With lifting points and offset discharge gate.
TU mechanism. This gate opening mechanism enables a continuous flow of the concrete from the bucket to the formwork. A tilting receptacle prevents cement grout leakage. The gate is made of abrasive high resistance steel to improve its lifetime .
This column skip is designed to enable concrete to be poured into narrow shuttering or columns. It is a rollover type skip whereby the skip sits in the horizontal position for filling and reverts to the vertical when in use. The offset discharge enables the skip to be used close to the side of existing walls where access with a centre discharge skip may be a problem.
This skip is lifted by chains (not included).
The removal of the traditional bale arm prevents the risk of crushing injuries to the operator and also reduces the weight of the skip.
Offset.
By means of a nylon rope attached to a spring return lever.
Skips with capacities of 1000L and above are fitted with the auxiliary gate closing option to ease the gate closure.