Laydown concrete skip with TI mechanism
With bale arm and offset discharge gate.
With bale arm and offset discharge gate.
TI mechanism (European patent). Very enclosing cone to get back cement grout leakage when pouring concrete. Tool less removable cone for easy cleaning. The gate is made of abrasive high resistance steel to improve its lifetime .
This column skip is designed to enable concrete to be poured into narrow shuttering or columns. It is a rollover type skip whereby the skip sits in the horizontal position for filling and reverts to the vertical when in use. The offset discharge enables the skip to be used close to the side of existing walls where access with a centre discharge skip may be a problem.
Bale arm.
Offset.
By means of a nylon rope attached to a spring return lever.
Skips with capacities of 1000L and above are fitted with the auxiliary gate closing option to ease the gate closure.