Laydown concrete skip with TE mechanism
With bale arm and centre discharge gate.
TE Mechanism. This mechanism is fitted with a wheel to enable a precise control of the concrete flow. This mechanism also offers a lever control of the gate. Warning: a non-continuous flow of concrete between the bucket and the pipe might provoke untimely overflowing
This column skip is designed to enable concrete to be poured into narrow shuttering or columns. It is a rollover type skip whereby the skip sits in the horizontal position for filling and reverts to the vertical when in use.
This skip is lifted by its bale arm.
Central.
Wheel.
Skips with capacities of 1000L and above are fitted with the auxiliary gate closing option to ease the gate closure.