Buffer skip for dry projetion concrete

This skip called "buffer skip" is used to store dry projection concrete mix. 

CTE V2

CTE V2

0,00 €

Labels & garanties du matériel

Presentation video

Use

Our "buffer skip" stores fresh concrete or dry concrete coming from the batching plant via truck mixers. Our buffer skips are commonly used in dry projection works.

Principle

When loading, the skip is in lower position, then the operator can raise the bucket for unloading and opening the gate.

Characteristics

  • 2 side hydraulic jacks made for the bucket raising.
  • Vibrator on the bucket. The vibrator is preferably used when using dry concretes dry projection).
  • Easy use: the skip must be plugged, switched on to be ready to run.
  • The raise and descent of the bucket and the gate opening/closing are operated from a lever distributor.
  • 4 side lifting eyes for crane or bridge empty handlings.
  • An exit reducer facilitates the loading of small skips.
  • Reinforced and longer under frame with floor fixations
  • Reinforced bucket
  • Protection tarp.
  • External electrical switch box (better access) fitted with live wire detector to avoid any plugging mistakes.
  • Protected added 32A plug (in case of another apparel)